< All Topics
Print

πŸ“Š How to Access and Manage Hazards & Risks Charts & Graphs

Visualizing hazard and risk data through charts and graphs enhances safety management and decision-making. This guide will walk you through the steps to access and manage these visual tools within Take5ℒ️Connect.​


Step 1: 🧭 Navigate to the Hazards & Risks Tab

  1. From the main dashboard, click on the Templates tab.
  2. Select the Hazards & Risks tab.
  3. Locate the bar labeled Charts.
  4. Click on the + button and select how many columns (1-4) you would like with the row.​


Step 2: βž• Add Charts & Graphs

  1. Once the chart view is open, hover over the + button on the right side of the screen.
  2. A drop-down menu will appear and you can select from a range of chart options specific to sites:

  • PIE: Hazards Statuses
  • Matric: Risk Assessments
  • Combo Chart: Historical Data


Step 3: πŸ”„ Filter and Set Date Range

  • To filter your charts and graphs, click on the Filter button at the top right of the screen.
  • A pop-up will appear where you can select specific sites, whether the hazard/risk is active or archived and set the desired date range.
  • If no date range is selected, it will default to the last three years.
  • Click Apply Filter once you’ve made your selections.
  • Note: Filtering and date ranges apply to the entire module; individual rows or columns cannot be filtered separately.​


πŸ“Œ Tips for Managing Charts & Graphs

  • If you navigate away from the module and return, the same chart view will be displayed.
  • To remove a chart, hover over the top-left corner of the chart and click on the X.
  • To add a new chart, click on the + button and follow the steps above.​


πŸ“ž Need Help?

If you need further assistance, please contact our support team:

πŸ“§ Email: support@take5connect.com
πŸ“ž Phone (NZ): 0800 582 535